1178. The term ‘Value’ in value engineering technique refers to the __________ cost of the product.

A. Function (utility)
B. Selling
C. Production
D. Total
✅ The correct answer is option A.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top